3/01/2013

2013 Plan V Job for Future

Integration consortium team and internal design negotiation is the most difficult potion for the project. For example, for trolleys and hoists, general arrangement drawing shall be approved by owner first and then the arrangement of trolley and hoist shall be regarded to lifting and running distance. Later, the weight of capacity shall be considered. The true is that integration consortium team is easier than internal negotiation. Perhaps the communication is easier to argue in same language. The boss who interviewed with me at the first facing mentioned that why the reason for an employee to quit the job. The answer is passionate. If you do a job which you are reluctant to handling or expelling, the problems will pile up continuously. I do not have much time to depress. To face one issue and try to solve and find out the answer is the only way to do. Depression is leave for the persons who living in the past. Originally, for English blog, I would like to share something about India life. However, the concept in my brain originates from the past life. I spend a long time talking with my mind again and again. It is kind of transformer and a kind of growing. In comparison with past, I build a strong and prompt recover rating in my deep mind. The road for future is exciting and fun. (:

2013 Plan IV Job for Obstacles

There are many obstacles for amounts of orientation. For example, for pumps, I shall take time to study each location of pumps. Individual pumps are just like small hearts to transfer liquid from one location to another. Without pumps seem like human body without blood. As same as other equipment, there are some specification are required.
1. Material, for some unique liquid, material is the key to the protecting from damage. Generally, stainless 316 is basic requirement. But, for some special environment, combined material is specific required in specification.
2. Design flow rate; design capacity and flow rate usually will multiply a safety factor for protection due to over operation.
3. If Impellers are changed, the head will upgrade to another performance curve.
All these design condition shall be considered during design period.
4. Inspection is another issue. Almost test is for pumps body not for motor. However, for a power plant, the electrical portion is much requirement than other plant. Hence, it will cause cost impact in the future, if we cannot persuade owner. Some obstacles can be solved but some are not. Waiting for the integration and patient characteristic to deal with them step by step. 

2013 Plan III Job for Relationship

Vessels, tanks, pumps, electrical heater, trolley & hoist and elevator etc…I cannot believe that during this half year I have touched many items which I never get into. As I mentioned before, keep reading is the only way to conquer this challenge.

Nevertheless, there is still some plight which cannot be solve and pending. For example, foe ammonia unloading compressor is first vendor who is reluctant to deal the business with my company due to the required document from our owner. The document is hard to prepare and it is not to mention getting approval from owner. If at long last we still cannot find out the vendor who can design and provide the document and drawings, we need to take all the jobs back for internal design. Although it is without extra cost, we can cut off cost from vendor. Unfortunately, for the heavy loading for each discipline at present situation, extra work and additional duty is hardship for the discipline. Some issues like this situation is needed to be careful and patient. Keeping relationship between vendor and owner for external communication is the point to learn and over come.

2013 Plan II Job for Mechanical Portion



How can I do for next step? Reading is the only key to the solution. No matter where I do my job or study at school, keeping reading is the way to integrate the massive and irregular concepts. Specification and contract is the gate which I shall pass through. For professional portion is related to specification. For business portion is for contract. They are totally different field. However, I am still required to study well by pressure. This pressure is a kind of sense of responsibility. I take the responsibility of mechanical equipment and package for my job. It includes Ash Handling System which conveys ash from the furnace ash bottom system to ash pond and ash shall be sold for recycling and used again. The second main package is seawater electrolysis which can electrolyze the seawater and transformer into lower microbe seawater for the system’s using such as cooling and heat exchange. The third package is air compressor system which supplies air for instrument and plant’s consumption. For a plant, it shall possess air, water and electricity to support its activity. None of them can be ignored. Besides above three packages, chemical feed system is for balance the content of water and liquid material. Ammonia Unloading Compressor is for SCR(Selective Catalytic Reduction); the system is to reduce NOx gas. Overall schedule and vendor status is required for me to control and arrange. It is totally different life compared to my past experience. It is fun and challenging.