3/01/2013

2013 Plan II Job for Mechanical Portion



How can I do for next step? Reading is the only key to the solution. No matter where I do my job or study at school, keeping reading is the way to integrate the massive and irregular concepts. Specification and contract is the gate which I shall pass through. For professional portion is related to specification. For business portion is for contract. They are totally different field. However, I am still required to study well by pressure. This pressure is a kind of sense of responsibility. I take the responsibility of mechanical equipment and package for my job. It includes Ash Handling System which conveys ash from the furnace ash bottom system to ash pond and ash shall be sold for recycling and used again. The second main package is seawater electrolysis which can electrolyze the seawater and transformer into lower microbe seawater for the system’s using such as cooling and heat exchange. The third package is air compressor system which supplies air for instrument and plant’s consumption. For a plant, it shall possess air, water and electricity to support its activity. None of them can be ignored. Besides above three packages, chemical feed system is for balance the content of water and liquid material. Ammonia Unloading Compressor is for SCR(Selective Catalytic Reduction); the system is to reduce NOx gas. Overall schedule and vendor status is required for me to control and arrange. It is totally different life compared to my past experience. It is fun and challenging.

沒有留言:

張貼留言